Thursday, July 28, 2016

Cabin Cover & Engine Choices

Cabin Cover

Section 43
It's the summer time, which means it's hot... excessively hot at times and there are several things that are practically miserable to do in the heat:
  1. Eating soup
  2. Going for a run
  3. Fiberglass Battle Dress
  4. Building a plane in the garage
When it's pushing 100 degrees outside even with an insulated garage and a fan it's still insanely hot.  I find myself grabbing rags and turning them into headbands, unconcerned that I previously used the rag to clean up Acetone.  On top of that my Fiberglass worksuit consists of an old Flight Suit from my sailor days, full goggles, gloves and and some sort of mask.  There's been times I've gone without this only to end up with fiberglass all over the place including my skin. So the unfavorable working conditions coupled with this summer being full of activities I feel like my progress has taken a bit of a hit.  I view it as a balance and as long as I continually make some level of progress then I'm good with it.

This brings me to what I've been working on lately.  I've been working on finishing up the wings control elements and wing tips in conjunction with the cabin fuselage.  Since I've made the most progress on the fuselage I'll write about that.  I decided to skip a number of sections and go to working on the cabin top fitting.  One reason is because there are some elements I'm undecided on for the interior that I want to think about it while I tackle these other things.  Another reason is this is a large piece that was sitting around and I wanted to do something with it.

I've heard there's a lot of angst with the cabin top and while it's not the most enjoyable part to deal with, knowing it's fiberglass and you can always fix it later helps out.  First part you do is trace the scribe lines and then go back and double check the scribe lines because they're not that accurate.

Pre-trimmed piece
 I choice to do the cutting in the driveway using disc grinder and then finished it off a bit with a disc rotary sander using 60 grit pads.  All in all I had to test fit it at least 10 times before I was happy with it and then another 2 times after that because I had overlooked parts.

First Trim

Closed that gap about another 1/16th of an inch.. rest will get glassed over


Once I was happy with my fit I pulled it off one more time to square up the edges per the plans and make sure nothing looked to wonky before I started the drilling.  I was happy to get back to drilling and really this part while a bit time consuming was enjoyable.  You basically put your forward tail skin on and use it as a guide to match drill #30 holes.  I broke all my smaller bits so used a 12" #30 to do this part.  You end up drilling a few, removing clecos and spraying out any material trapped between the skin and cabin top, then recleco and move on.

Action shot!
The step of centering the front brace with the fuselage top was a lot harder than I had anticipated. I tried several methods to center it taking various measurements clamping it in place stepping back, looking at it.. rinse repeat.  In the end it's centered as well as it can be, not sure what other people used but the best method for me was to center a large measuring stick across the front and then center the bar on that.  I'm happy with hot it looks.


So I'm now complete with this section for now.  The rest of the section involves trimming and placing the windshield and rear side windows.  Physically attaching the top along with all the fiber glass work which has to occur.  Because I will be removing the top for the interior, avionics, center channel ect this will end up being one of the last things I do before moving this all to the airport.

Now, it looks like a plane

Barrett Precision Engines

BPE is a shop out in Tulsa that overhauls a variety of aviation engine types for both the Certified and Experimental market.  I happened to be in Tulsa for work and took some time to check out their facility.  Monty and Allen were great and really helpful in showing me around and answering any questions I had.

When I first started looking into engines my kneejerk reaction was to get a brand new Lycoming 540 from Vans and install that.  I had called Rhonda at BPE and she did a good job explaining the differences between buying a new Lycoming vs an overhauled engine.  Essentially the pricing is relatively the same but the big difference is going through BPE you can be very specific on what you want with and done to the engine.  There's some features you can get on an overhauled engine that you can't really get on a Lycoming until after the fact and at that point you'll have some extra parts to sell and some extra costs in having a set of new Bendix magnetos for example installed.

My take away from the trip is I am aiming for a Lycoming 540 with 9:1 compression and most likely their cold air induction system.  The cold air induction system replaces the bottom oil sump pan with another one that has the air intakes on the outside, meaning the hot oil isn't heating up the air going into the engine.  This will make the bottom part of the engine hanging down lower than the standard engine, meaning unless I really want to do a lot of fiberglass work I'll have to get an aftermarket cowl from Show Planes. 

Another option if I decide the cost increase vs performance isn't there then I'll end up getting the same engine without the cold air induction system.  It's still a phenomenal engine but then I can get Rod Bowers ram air kit for both increased performance. An added value to this option is the easier lower cowl removal.  You end up taking the fiberglass cowling piece around the kit off and then the bottom cowling can move out without hitting your 3 blade prop.

Still have plenty of time to make some of those final decisions but bottom line is I'm getting the engine from BPE.

Friday, June 24, 2016

Access Covers and Floor Panels

Section 35

If there's one thing I learned in this section it was that the Pneumatic pull rivet gun is a real time saver. You are still required to use the hand riveter in tight spaces but when kicking out a row of cherry rivets you can roll through them fast, and your hands won't hurt.

You want to make sure your conduit is in place and you know where you're mounting things before you start closing up.  The plans actually specify that you should do your wiring before closing up the panels but since I have conduit I won't need to get into these spaces again.

I also decided against priming and painting the access panels, I may change my mind on some of them in the future but I really don't see the need right now.  These are easy enough to get to that if corrosion does form I can easily replace them.  Aesthetically I'm doing a full interior with carpet, panels, ect so they won't be visible anyhow.  Any of the visible parts I'll end up painting later, ie seat back, baggage area bar.






Final picture with panels and upper fuselage attached

Thursday, June 9, 2016

Baggage Door

Section 34 
It doesn't seem like an exciting section, but having a functional door on the plane is pretty neat.  Wasn't overly difficult but had it's own set of challenges.  Ensuring the hinge is lined up takes a bit of time.  Riveting the skin the frame is a bit awkward and resulted in a few smiley, in hind sight if someone would of been there to help me hold it, it probably would of turned out cleaner looking... oh well it's getting painted anyhow.


Inside
Open and Closes
It's done for now, I did go ahead and order locks and door seals.  For the locks I ordered Fort MFW1058 cam locks for the baggage and pilot door.  These use a cylindrical key which will hold up better over time, however you have to order (Part M930101211W010J) or make a longer cam for the baggage door.For the seals I went with 10 feet of McMaster-Carr 93085K67.

Done pending locks and seal

Thursday, May 26, 2016

Steps Install, Fuselage Conduit, Sound Proofing/Insulation & Baggage Area

Steps Install

Section 30

A majority of this was completed by the quickbuilders so it's not really a time sink, really all that's left is pushing in the actual steps and bolting them in place.  However slight problem with my kit as I didn't get the two AN3-20A bolts used to final attachment. They are typically shipped holding a temporary bar in place... however that wasn't the case with mine and holding my temporary bar in place were crate wood screws instead, no big deal Vans just had to send me a few.

During nightly research reading session I learned that there have been cases of these steps becoming loose over time.  A few solutions builders like to do is to install inspection panels made up of the stall horn access plates so you can visually inspect the bolts and tighten if need be.  These panels don't allow you to take the screws out so I don't really see the point.  Also continually tightening the bolt will just space the pipe, so I went with a different solution.

I bought Step Bushing from TCW technologies which more or less fill in the space allowing a tighter more secure fit.  I literally was able to push the bushings down into each step using a hammer, piece of PVC and a string (In case you have to pull it back out).  Then it's a matter of torquing the bolts down to spec and moving on.  If there comes a point where I need to visually inspect this area I can retro fit an access panel, much like I did on the wing.


Fuselage Conduit

As with the wings I struggled a bit on how to route the conduit.  Then I found a Matronics post with some great pictures, even reached out to Carl Froehlich for some clarification.  In the end I did a total of 6 (3 each side) runs using the flex pipe from Vans.  Where I needed to drill 3/4" through the seat panels and ribs I made some doublers.  Probably didn't need them but gives it a cleaner look in the end.
Drilling these were not easy



Sound Proofing/Insulation

Some say you don't need it, some say you do... I decided I do despite flying with a fantastic ANR headset.  The product I went with was 1/2" Self adhesive foam from  Soundproofing.org. I suggest going through them because for whatever reason ACS really ups the pricing going from 1/4" to 1/2".  I ordered 20' worth, and it's too early to tell if that's enough or over kill but so far it looks like I should be able to do the cabin side of the firewall and the walls.  I can't take credit for the install though, that's being done by my wife who has found her niche in aircraft construction.


Another place I've added insulation is under the front floor boards.  Since I wasn't able to remove the floor panels due to the gear weldment I decided to just spray foam instead.  The aviation section of Home Depot has some fire resistant canned stuff that worked well.  Just place some paper or tape or something under the rear holes and get to spraying.  After shooting a can under each side let it cure for a day and cut out any excess that squeezed out.


It's the orange stuff

Baggage Area

Section 33

The baggage area was an on again, off again piece of work that I've been cracking away at for a bit. There's some decisions that you have to make such as conduit, soundproofing, step and other odds and ends posted above prior to riveting down the floor boards.
The plans also separate out QB vs Standard build actions however maybe the guys in the Philippines were working off a different set of plans because they missed a number of items.  Not a huge issue just need to double, triple check what was supposed to have been done was indeed complete. The rest of the actions required isn't anything challenging but does take some time.  There's a lot of drilling, a lot of nutplates, a good bit of riveting and such.

I did borrow a friends pneumatic cherry rivet gun to try on the floors.  Here's a picture of it...


It actually takes a bit to get used to. You need to make sure you have the correct end on it, I had an end that was for more of a LP rivet so when I ran some CS rivets it rounded the top requiring me to drill them out.  After about 10 mins you get the hang of it and you can whip through pulled rivets like nobody's business.  There are still areas though where the cramped spaces require you to use a traditional hand riveter.

Below are some pictures of the progress at random points...




Those bushings are to protect the panels from the seat belt cables
That's the baggage area completed

Friday, May 6, 2016

Fuel Tank Test, Wing Conduit and Bottom Skins

Fuel Tank Test

One fairly critical component of the QB inspection includes testing of the fuel tank for any leaks.  These tanks are notoriously challenging to build and get sealed up, luckily Vans does this for you on the quickbuild but highly suggests you test them yourself.  To accommodate this Vans sends you a testing kit with your shipment.  Since I removed the tanks from the wings to inspect it makes it fairly painless to run the suggested tests.  I did have to reach out to the VAF forum with a few questions about the process.  There are several methods you can use to test the tanks but I decided to go with the one the kit is for.  One issue that wasn't clear to me was the kit requires you to have the tank fuel filter installed to use one of the caps. Once that was figured out the rest went smoothly.

Tester Kit Parts

The picture above shows the parts of the testing kit; fill stem you screw on, cap for the fuel filter and a balloon cable tied to the tank vent line.  Now the purpose of the balloon is to ensure you don't over pressurize the tank, so if it pops then that's too much pressure... if it doesn't fill then you have a big leak somewhere.  I used an air compressor turned down to the lowest PSI setting to fill, would fill for about 5 seconds and wait and repeat until the balloon was inflated.  Then it's like testing a tire, you just spray soapy water all over the place and look for bubbles.   The only bubbles I had were around the balloon since the cable tie wasn't air tight. Happy to saw that both tanks passed their tests and are ready to be reinstalled onto the wings.



Wing Conduit

The subject of conduit for both the wings and the fuselage is something that I really struggled with.  Searching the internet you find that everyone does it a bit different and some don't do it at all.  For me this plane I plan on having for a very long time and would anticipate a number of avionic upgrades so conduit is a must.  Right sizing of the conduit is also a must, you don't want to end up with too little, and you really don't want to end up with a mess of conduit to have to work around.

What I ended up doing is running 1/2 CPVC down the wings in the factory drill holes, it's an extremely tight fit, it's light weight and large enough to accommodate all my wiring needs.  I went ahead and put a break in the conduit where the bell cranks go which allows me to run wires from that area down the conduit as well.





1/2" CPVP Conduit, SB-375-4 bushing for AoA and Pitot lines
Something else that needs to be resolved before closing up the wings is your Pitot situation.  I plan to use a heated Pitot/AOA combo meaning I need to install a mounting bracket for that.  I went with the Gretz Aero kit because it's compatible with multiple vendors so if I decided to stray away from Garmin I'll be able to use a Dynon or some other vendor.  The instructions seems a bit confusing but if you look at the pictures you get an idea of what you need to do and it only took about two hours to go through and get it all mounted.  That includes making the bracket, etching and priming.




The Pitot/AOA combo also requires running two separate air lines.  I decided to use the standard run already drilled on the kit and then make an additional hole to run the second line.  Now I would be lying if I said this was easy because the inboard holes on rib three and four which is covered with a skin was a tad challenging.  I ended up using an additional drill head and connected that within the cavity I was drilling... okay that probably doesn't make sense, a better method would be to get a foot long 3/8 inch drill bit.

The final step before I could close the skins was to mount the autopilot roll servo bracket and the Aileron trim. Will have to connect them all later but for the time being all done.




Bottom Skin


This section is all old hat to me.  Although very time intensive, it's not overly challenging from a process perspective but requires quite a bit of ninja skills if you're going to solo rivet.  The gap fairings went on well with the only hangup getting the last four rivets on the flap fairing.  I had help but it was to no avail with trying to get a bar at the very top... In the end I used pop rivets for the four rivets.  Standard builders would have no issues since the inboard bottom skin wouldn't have been attached yet.




Those are the four pop rivets
My cousin who flies C17's down in Altus was up and helped me get started on the actual skins and jstiffners.  We rocked through all the match drilling in about 3 hours.  I saved him from the agony of the deburring and dimpling, he would like to build a plane at some point and those two processes might have quickly changed his mind.





Here's the Gretz Pitot mast after match cutting a hole in the skin.
It was a tad confusing on the actual riveting process.  After reading the plans a good 10 times and looking for pictures online I figure out that you started in the middle, worked your way to the sides at the top and then down... ignoring the three outboard bays.  That's because to get to those you roll the skin back and hit those when you can.  I would suggest having help, but then again I was able to do it solo with only a few minor cuts and bruises.  I'm very happy with how my rivets turned out, only about two dings per side.


All buttoned up